Real delivery stories from field drilling to final commissioning. Open any project for full media and details.

February, 2026
This project was delivered for a client developing a student hostel in Ile-Ife. Our team carried out the drilling and setup with precision, providing a dependable water source early in the project so construction could move forward smoothly and without delays.
Ile-Ife, Nigeria • 2 days

February, 2026
At Omidele New Hostel in the Agbale axis of Ede, we delivered a complete borehole drilling solution tailored to the site’s needs. The result is a stable and reliable water supply that supports daily hostel use with confidence.
Ede, Nigeria • 1 day

September, 2024
This project was a rescue operation for an under-construction residential building located behind the Oba of Iragbiji’s residence. After three previous drilling attempts with different machines had failed, our team was called in to resolve the issue. Leveraging our expertise and the right equipment, we successfully drilled and installed a functional borehole on our first attempt, ensuring a reliable water supply for the building and overcoming the challenges that had hindered previous efforts.
Iragbiji, Nigeria • 1 day

September, 2024
This project involved drilling and installing a borehole for an under-construction residential building in Okinni. Thanks to our team's expertise and experience, the job was completed quickly and efficiently. We are confident that the borehole will provide a reliable water supply to meet the future needs of the building’s occupants, ensuring sufficient water for daily use and household activities.
Okinni, Nigeria • 1 day

August, 2024
Sumonu and Nasirat Hostels at Agbale, near Federal Polytechnic Ede, Osun State, provide accommodation for 48 students in 24 self-contained rooms. Accessing water was a major challenge because of the tough terrain, but with persistent effort, two boreholes were drilled in less than 24 hours, ensuring a steady water supply for the hostels. This development has brought much-needed relief to the students, allowing them to concentrate on their studies without the constant worry of water scarcity.
Ede, Nigeria • 2 days

April, 2024
At the top of the Otan Ayegbaju mountains, where accessing water seemed nearly impossible for a residential project, our team embraced the challenge with dedication and passion. Despite the tough terrain, we worked around the clock to find a reliable water source. Our successful drilling brought much-needed water to the community, transforming a daunting task into a source of joy and relief for our client.
Otan Ayegbaju, Nigeria • 2 days

January, 2024
The Ayetoro area of the state capital is known for its low water yield, making it difficult to secure a reliable water source. However, our team successfully drilled a prolific borehole for our client, overcoming the challenges of the location. The result? A dependable water supply that has exceeded expectations, leaving our client and the community thrilled.
Osogbo, Nigeria • 4 days

June, 2024
Iresi, a town surrounded by towering granite mountains, presented unique challenges for our team. The urgency of this project required us to work around the clock, navigating the rugged terrain to meet the community’s needs. Despite the tough conditions, we delivered exceptional results, completing the project ahead of the deadline and ensuring the town's water supply needs were met without delay.
Iresi, Nigeria • 3 days

February, 2024
We successfully partnered with the Executive Chairman and WES Director of Boluwaduro Local Government to complete a crucial state project. Within just one week, we drilled, installed, and constructed stanchions and fetching points for two boreholes, ensuring efficient water supply for public use. The project concluded with thorough pump testing and a formal commissioning, marking a significant achievement for the Iresi community.
Iresi, Nigeria • 1 week